Banner

行业知识

The initial run-in time of the hydraulic feller is very important

  Hydraulic fellerThe advantages are high rated loading quality, high bucket storage capacity, improved loading capacity, overall bucket width, good breakout force, large wheelbase, large wheelbase, small ground clearance, and all machine equipment quality Lightweight, low rated power, and clever specifications.

The streamlined design of the hydraulic feller is unique. It adopts national famous brand diesel engine, powerful driving force, reliable operation, high efficiency, environmental protection and energy saving. The work machine equipment is automatically set up, and the computer is optimized for design, and the work efficiency is high. The new sealed car cab, Grammer seat, can be equipped with heating and cooling air-conditioning, the actual operating environment is more comfortable.

Hydraulic feller

Because of the influence of factors such as the processing, installation and adjustment of mechanical parts of new machinery and equipment such as hydraulic fellers, the friction surface is not smooth, the contact area of ​​the mating surfaces is small, and the bearing capacity of the surface is uneven. During the operation of the machinery and equipment, the convex and concave parts of the surface of the parts are interfitted and rubbed, and the metal slag that is ground down is used as an abrasive to participate in the friction again, which speeds up the destruction of the mating surface of the parts. Therefore, the break-in time is easy to cause the destruction of the parts, and the destruction speed is faster. At this moment, if the load is operated, it is likely to cause the destruction of the parts and cause the initial failure.

Running-in time is a key step to ensure the regular operation of machinery and equipment, reduce the repair rate, and increase its service life. But at present, some users ignore the special technical standards of the running-in time of the new machine because they lack the basic common sense of the felling machine application, or because they are in a hurry, or want to get income as soon as possible. Some users even feel that, anyway, the manufacturer has a warranty period, and the manufacturer is responsible for the maintenance of broken machinery and equipment. Therefore, the machinery and equipment are subject to long-term load application during the running-in time, resulting in frequent failures of the machinery and equipment at the beginning, which not only affects the machine The conventional application of equipment has reduced the service life of machinery and equipment, and the destruction of machinery and equipment has also affected the construction progress.

液压伐木机